Signed in as:
filler@godaddy.com
Signed in as:
filler@godaddy.com
PROJECT ID: PCOMAY01550
BUDGET: $550.00 – 1,000.00 USD
EST. TIME: 10-30 Days
We are developing a compact gas turbine system with a compressor comprising two centrifugal stages on a common shaft, each housed in individual scroll casings (sequential turbo configuration).
The system targets a combined pressure ratio of ~10:1, with stage-to-stage flow routed via an external crossover.
Design Conditions & Constraints
Material & Manufacturing Constraints
All rights reserved © 2026 PieCube Technologies Pvt. Ltd.
Made In India - For The World